HEAP LEACH PAD DESIGN AND CONSTRUCTION PRACTICES
leach pad with a stacked and leached ore heap in the background is shown on Photo 2. Each ore lift surface is wetted uniformly during leaching by using irrigation drip emitters or sprinkler sprays. Leaching is generally conducted in 30 to 120 day or longer leach cycles with barren or