TELEOP FOR AN OPEN PIT COPPER MINE HARDLINE Solutions
The systems remotely operated three haul trucks ( 830EAC), two dozers ( D375A and 834H), one shovel ( PC55006), and one water truck ( HD7855LC) in the open pit. HARDLINEs nonproprietary network was installed onsite with access points to connect the machines to the Teleop systems via WiFi.